Friday, August 13, 2010

ALMOST DONE...........







Site prep is now in the final stages. Concrete is scheduled to be poured on Monday the 15th. First picture shows the trenches being dug for the utility pipes. The second the plumbers installing the in-floor heating system. And the third at the end of the day with the heating system in place. Now for a building inspection and the cement trucks can roll. Weather forecast is for sunny and 70's, should be perfect.
The lot was a challenge as a building site which was anticipated, but until the digging began and the set backs marked it wasn't known exactly what we were dealing with. Without blasting the rock off and spending lots of $$ or bringing in tons of fill and spending lots of $$, the plans have been downsized for the house and parking pad with the shop.
So at this time the shop is on hold, the good news is there will be room to park and more importantly turn around. Fill will be brought in down near road side for a possible shop in the future. If that doesn't work a shop will be built with Scott (Shawn's twin who lives within walking distance) at his house.
Hope to have an exciting update on Monday, enjoy the weekend!

No comments:

Post a Comment