The kitchen has been transformed from lines on the concrete to cabinets and drawers that can be opened and closed. The countertop is being built and will be installed by the end of the week. The bathrooms have been prepped for the tile work to begin. Good thing all the decisions have been made as Shawn has Packer Fever and nothing else is on his mind these days. The final touches on the siding is also done the corner pieces.
No comments:
Post a Comment